What digital PA covers a gas insulated substation (GIS)?

Industry: power plant | Architecture: DIGITAL
GIS substations need PA for high-voltage equipment areas with minimum electromagnetic interference. Digital PA with EMI-hardened equipment. SF6 gas leak detection integration for emergency broadcast. Zone separation for GIS hall, control room, and outdoor switchyard. Emergency broadcast from substation control center. Battery-backed power for 8-hour autonomy.

Technical Details

Recommended Products

BNA-DX32, BNA-EMI-SP, BNA-DA500

Interested in this solution? Get a free technical quote for your facility.

Request Quote →